Versteden Leidingsystemen bv
Versteden Leidingsystemen bv

  Home  

  News  

 

 
  Field of application  
  Product overview  
  Joints  

 
  Certificates  
  Cases  
  References  

 
  Contact & Route  
  Links  
  Jobs  

 


GRE fire mains for ETT 3
 
Following on ETT 1 and ETT 2 is currently ETT 3 build to increase the capacity of the VTTI storage in Rotterdam with 465,000 m3.

Versteden Leidingsystemen has acquired the contract for the supply and installation of the required GRE underground fire mains and foam lines. A total of 4.5 km pipelines in diameters of 4" to 20", in pressure class PN 16 and PN 25. To make the required assembly time as short as possible we choose for prefabricated pipes. The pipes are connected on location with a tensile link and each pipe is separately extorted by the integrated test nipple at the joint.



 
 
HOT WATER PIPES FROM E.ON TO LNG TERMINAL
 
On the Maasvlakte in Rotterdam Gate Terminal builds the first Dutch LNG import terminal. This terminal will liquefied gas by ship, stored in three huge storage tanks and later ...
 
Download the whole article (dutch) in Europoortkringen here



© copyright Versteden Leidingsystemen 2010